Granite St house being set.
Plates and knee walls done. Time to get the house delivered
Roof on in Derry Garage
Sewer line run and inspected,. Perimeter drains in with inspection tonight. Moving right along on Granite St house build.
Derry garage coming along.
Foundation is sealed, now on to perimeter drains.