Day 2 & 3:
Two Bedroom Duplex.
Painting & Preparing For Rental.
#WeDoRentals
#TheHammerProject
Day 1:
Two Bedroom Duplex.
Painting & Preparing For Rental.
#WeDoRentals
#TheHammerProject
Day 1:
Two Bedroom Duplex.
Painting & Preparing For Rental.
#WeDoRentals
#TheHammerProject
Day 3 1/4:
Working In Rain!
Adding In A Sunroom!
#WeDoAdditions
#TheHannahsProject
Day 2 1/4:
Adding In A Sunroom!
#WeDoAdditions
#TheHannahsProject
Day 2:
Adding In A Sunroom!
#WeDoAdditions
#TheHannahsProject
Day 2:
Exterior House Painting.
Fixing Eves, Caulking Holes & Cracks, painting Trims, Corners & Eves White. Blue Walls.
#BlackBurnBridge
#WeDoExteriorPainting
Day 1:
Exterior House Painting.
Fixing Eves, Caulking Holes & Cracks, painting Trims, Corners & Eves White. Blue Walls.
#BlackBurnBridge
#WeDoExteriorPainting
Day 2:
New Floors For A Grand Opening To Come
#WeDoCommercial
#ThePlazaProject
Day 2:
New Floors For A Grand Opening To Come
#WeDoCommercial
#ThePlazaProject
Day 1:
New Floors For A Grand Opening To Come
#WeDoCommercial
#ThePlazaProject
Day 1:
Two Bedroom Townhouse
Demo Day.
Ripping up Carpet, Tile, Vinyl, Nails, Staples, Popcorn and Wallpaper.
#WeDoRentals
#TheHammerProject
Day 1.
Pressuring the Whole House, Painting n Sealing all Windows and Replacing Garage Entry Door.
#MarketPlaceProject
#WePresureHomes
Day 5:
Had to put a pulse on this projectvfor a few month, but back at it full fledged.
Now laying down New Beams -n- Sub Floors then Laminated Flooring in the Bathroom, Hallway, Living room and Kitchen.
Complete Bathroom, Living room & Kitchen Remodel an.
#SweetWaterProject
#SingleWideRemdel
Day 5 to 9:
Exterior House Painting.
Fixing Eves, Caulking Holes & Cracks, painting Trims, Corners & Eves White. Blue Walls.
#BlackBurnBridge
#WeDoExteriorPainting
Day 4:
Exterior House Painting.
Fixing Eves, Caulking Holes & Cracks, painting Trims, Corners & Eves White. Blue Walls.
#BlackBurnBridge
#WeDoExteriorPainting
Day 3:
Exterior House Painting.
Fixing Eves, Caulking Holes & Cracks, painting Trims, Corners & Eves White. Blue Walls.
#BlackBurnBridge
#WeDoExteriorPainting
Day 2:
House Rehab!
Bathroom Floor Tiles and Shower Wall Tiles!
Taping -n- Sanding Walls, Installing Floors, Paint and More!
#HomeRehabs
#TheHermanProject
Day 1:
House Rehab!
Bathroom Floor Tiles and Shower Wall Tiles!
Taping -n- Sanding Walls, Installing Floors, Paint and More!
#HomeRehabs
#TheHermanProject
Day 5:
She'll still need some touch-ups and then a second hand
Sanded n Prepped for painting. Mud is taking to long to cure due to the cold, but she's getting done
Hanged Sheet Rock on the Ceilings.
Mudding & Sanding. Removing then Replacing Crown Molding.
Removed all Light Fixtures and Detectors.
#TheRiverHouseProject
#WeHangSheettock
Day 4 1/2:
Sanding n Prepping for painting. Mud is taking to long to cure due to the cold, but she's getting done
Hanging Sheet Rock on the Ceilings.
Mudding & Sanding. Removing then Replacing Crown Molding.
Removed all Light Fixtures and Detectors.
#TheRiverHouseProject
#WeHangSheettock
Day 3 1/2:
Hanging Sheet Rock on the Ceilings.
Mudding & Sanding. Removing then Replacing Crown Molding.
Removed all Light Fixtures and Detectors.
#TheRiverHouseProject
#WeHangSheettock
Day 2 1/2:
Hanging Sheet Rock on the Ceilings.
Mudding & Sanding. Removing then Replacing Crown Molding.
Removed all Light Fixtures and Detectors.
#TheRiverHouseProject
#WeHangSheettock
Day 13:
Getting ready to Tile the Kitchen, Dining room and Landry room.
House Rehab!
Bathroom Floor Tiles and Shower Wall Tiles!
Taping -n- Sanding Walls, Installing Floors, Paint and More!
#WeDoBathroomTiles
#HomeRehabs
#TheHermanProject
Day 13:
New Facia, New gutter and Down Spout.
The whole house is Primed.
Master Bathroom and Main Bathroom Shower Walls are cut Mortared and Placed. Just got to Grout them.
The Whole House Is Mudded. Now Sanding and Painting.
House Rehab!
Bathroom Floor Tiles and Shower Wall Tiles!
Taping -n- Sanding Walls, Installing Floors, Paint and More!
#WeDoBathroomTiles
#HomeRehabs
#TheHermanProject
Day 8:
Livingroom Floor, Foyer, Hall and Coat Closetis finished being layed with Bamboo flooring.
Ran out of Morter and Cement boards.
Transitioning into the Kitchen and Breakfast area. Bamboo Flooring in the Livingroom, Foyer and Den from the Dining room.
Double Layered Wall Paper removal, Adding In a Bathroom exhaust, Priming -n- Painting. That is just the Upstairs there's more to be done in this home.
#TheGolfCourseProject
#WeDoAllTypesOfFlooring
#WeScrapPopcorn
#PaintersRUs
#WeRemoveWallpaper
Day 12:
The whole house is Primed.
Master Bathroom and Main Bathroom Shower Walls are cut Mortared and Placed. Just got to Grout them.
The Whole House Is Mudded. Now Sanding and Painting.
House Rehab!
Bathroom Floor Tiles and Shower Wall Tiles!
Taping -n- Sanding Walls, Installing Floors, Paint and More!
#WeDoBathroomTiles
#HomeRehabs
#TheHermanProject
Day 8:
Ran out of Morter and Cement boards.
Transitioning into the Kitchen and Breakfast area. Bamboo Flooring in the Livingroom, Foyer and Den from the Dining room.
Double Layered Wall Paper removal, Adding In a Bathroom exhaust, Priming -n- Painting. That is just the Upstairs there's more to be done in this home.
#TheGolfCourseProject
#WeDoAllTypesOfFlooring
#WeScrapPopcorn
#PaintersRUs
#WeRemoveWallpaper
Day 7:
Transitioning into the Kitchen and Breakfast area. Bamboo Flooring in the Livingroom, Foyer and Den from the Dining room.
Double Layered Wall Paper removal, Adding In a Bathroom exhaust, Priming -n- Painting. That is just the Upstairs there's more to be done in this home.
#TheGolfCourseProject
#WeDoAllTypesOfFlooring
#WeScrapPopcorn
#PaintersRUs
#WeRemoveWallpaper