Remove stumps, add 80 tons material to elevate grade/stabilize soil, grade and level, blend with existing, sod to specs
Remove railroad ties, construct retaining wall.
Boulder wall to support cement/pool
Patio and walkway to relax and accessibility.
Rock/edge around house, 2 retain block egress structure’s
Mend failing retaining wall, dismantle then rebuild, add drain rock and tile
Remove 9 large lilacs, 2 trees, and brush. Plant 9 arborvitaes.
Construct directional berm to improve water flow, replace timber retain wall with block, grade class 2 crushed granite
Now is a great time to start planning for spring.
Get on top of the project completion list.
This way you can have all summer to enjoy that new outdoor space.