Whole house done β
bathroom remodeling (pluming,tile installations of vanity,toilet ,faucets etc ) redo the whole floor (installation of floors)
Electricity (replacement of switches,outlets 220.add exterior lights ,installation of fans etc )
Redo the whole kitchen (install of gabinetes,installation of oven ,dishwasher,faucet ,Drain ,disposal garbage,etc )
Paint (paint the whole house,interior and exterior.)
Baseboards
Installation of doors
Installation of carpet (bedroom and master bedroom .)
πͺπΌπ
Bellaire β
siding, blinds, garage door..and paint.
Hardwood floor π the whole second floor!.
Sugar land
Another job done β
β
Done
β
stairs
Another one done β