The first building of the LVI Global campus construction was completed in 1998 and the additional building on the 5 acre campus in 2003 providing over 60,000 sq/ft of educational facility. This includes 8 lecture halls, a 60 bench hands-on laboratory, two live patient clinics containing 20 working dental operatories as well as a teaching operatory that allows video of procedures to be broadcast or watched in other locations around campus. A lecture hall and hands-on teaching lab that is equipped with monitors at each station for using advanced computerized diagnostic technology. The clinical operatories are all equipped with state of the art diagnostic computerized jaw tracking and sonography as well as EMG scanning technology.