Time is money, and the less time your crews have to wait for new scaffolding to be erected, the faster the job will be finished. For larger projects, have at least two systems, so that when one section of the project is completed, crews do not have to wait for tear down and reassembly.
Safety is the primary factor in using scaffolding, and the safest system to use depends on the job. Pedestrian safety, the height of the structure, and the work being performed must all be considered.
While a scaffold is a temporary structure, a lot of care must go into putting it up. After all, the safety of workers will depend on how well-built it is, so the proper procedures must be followed to ensure that nothing goes wrong.
Aside from keeping workers safe, scaffolds also allow them to work much faster. Given the space available, workmen can bring an adequate amount of tools and materials with them, thus minimizing the need to climb up and down.
For workers to get to the upper levels of a scaffold efficiently, there will have to be some sort of access structure built into the support. Depending on how tall it is, the scaffold may be fitted with ladders, ramps, walkways, or even stairs.
To prevent construction workers from getting into accidents, contractors must provide their people with the necessary safety equipment. Scaffolds, for instance, are particularly important as they diminish the risks involved in working off the ground.
When work access is through a window, window jack scaffolding is one option. It is a variation on a cantilever system, and is supported by brackets (jacks) that pass through the open window and brace against the building.
If you need to fix something that's pretty high up, you may be able to use a tall ladder. However, if the area you need to cover is wide, you're going to want to use a scaffold as it will allow you to safely move around.
If you need to paint the exterior of your home, you're going to need more than paint and brushes to do the job. You're also going to need to have scaffolds available so you can work on the highest parts of the structure safely.
If ceiling work is needed (plastering, painting, structural and systems repair, etc.) the scaffold must have a stable base proportional to the height, and a deck wide and strong enough to accommodate the number of workers and the weight of the materials and equipment being used.
In the process of putting up a scaffold, the crew will need to make sure that the support sits perfectly level. As such, they will need to take several bubble level readings to ensure that all the parts are correctly aligned.
Frame scaffolding is a versatile system that works well for a variety of projects. It can be as tall as several stories and still fall within OSHA guidelines and works well indoors or out. It can be assembled and disassembled as needed.
Building and maintaining your own scaffolding is an expensive endeavor. Not only must all components meet ASTM and OSHA standards, the equipment must be properly stored when not in use. Working with a scaffolding contractor saves you money on all your projects.
If the scaffolding will be covering public walkways, and it will be necessary to maintain access to them, the planking must be of sufficient size to prevent materials, tools, and equipment from falling through spaces along the scaffolding. Some communities may require low walls to prevent materials from sliding off the structure.
When cleaning windows on multi-story buildings, advanced equipment is required. Depending on the height, specialized scaffolding, safety harnesses, and other protective and safety equipment may be needed.
When fixed scaffolding is needed, our team of experts first surveys the sight to determine if it is level. If not, a leveling plan is developed for worker safety. If the scaffolding needs to be moved to another location, leveling may again be needed.
No matter how uneven the ground is, scaffolding should always be very level. As such, a good deal of preparation will be needed to ensure that the sole plates that support the structure are secure and that the base jacks are adjusted correctly.
One good way to ensure that construction workers are kept protected is to install railings on scaffolds. This is particularly important if the workers are well above the ground as railings will provide an extra layer of safety and security.
Before assembling the next level of scaffolding, make sure all lower levels are completely decked, as improper decking is the most common cause of falls on scaffolding. Should a fall occur, the drop is limited to only the next lower level.
We carefully inspect all of our scaffolding equipment after it is returned and before it is re-issued for cracks, breaks, metal faults, or other defects and safety hazards. In addition, if damage occurs while the scaffold is in use, we will replace it.
Not only must suspension scaffolding itself be capable of supporting four times its load rating, but the supporting structure must also be able to support the weight of the system plus four times the scaffold’s load rating.
Frame scaffolding is a versatile system that works well for a variety of projects. It can be as tall as several stories and still fall within OSHA guidelines. It works well indoors or out and can be assembled and disassembled as needed.
Safety is the primary factor in using scaffolding, and the safest system to use depends on the job. Pedestrian safety, the height of the structure, and the work being performed must all be considered.
Time is money, and the less time your crews have to wait for new scaffolding to be erected, the faster the job will be finished. For larger projects, arrange for at least two systems so that when one section of the project is completed, crews do not have to wait for tear down and reassembly.