Another beautiful cedar deck with Trex composite railings. Also ran new electric and plumbing for a laundry room and powder room. In and out in 3 days.
Happy to make a comfortable place for my friend and his family to relax. Built this deck roof with all custom metal and soffit. For a free estimate call 856-316-5392
HIBU.US
From a Phoenix General Contracting LLC customer
Phoenix General Contracting LLC
August 18 at 4:15 PM ·
When other contractors and inspectors try and make your clients life unbearable, Phoenix takes the wheel every step of the way. New sliders, new Trex deck with Trex railings built from sliders to the pool. Custom stairs and new 6’ vinyl privacy fencing. It was a pleasure to get this done for Angela and mike!!
Phoenix General Contracting LLC
August 25 at 12:19 PM ·
Little upgrade on this side. Customer wasn’t sure how the deck boards would look against the 70 year old stonework on her house, I told her that I could show her better than I could tell her. All Trex railings and deck boards, custom stairs and brown lattice to finish it off.
Phoenix General Contracting LLC
August 26 at 9:09 PM ·
Little one day demo and rebuild of this deck in Hatboro. All Trex deck boards and railings. Little lattice and stairs to finish it off.
Before and after kitchen remodel. New floors, new cabinets, new countertops and new tile backsplash and paint. Would have been in and out in 4 days if we didn’t have to wait for the countertops to be made.
4 day bathroom remodel
Customer waited 15 years to update her bathroom. We tore it down to the studs, changed the plumbing, added new electric and recessed lighting, paint, 4 different types of tile and gave her her new bathroom in 4 days.
Demo old wood deck Thursday morning. Friday afternoon.... footers done, new deck framed, new composite deck boards in and vinyl pergola almost complete. Start to finish will be 4 days..
Demoed, framed and installed Trex deck boards and trex railings in two days. If your contractor screws through your brand new composite, you don’t have a good contractor. Tip of the day.
Final punch list on this large basement remodel.
- 60’ of French drain install with two pumps
- all new framing, insulation and drywall
- custom shower build in remodeled bathroom
- upgraded 100 to 200amp service and new 30 breaker panel. All new lights, outlets and switches
- remodeled basement entry with new stairs
- 700 sq ft of new laminate flooring
Always a pleasure to work with great customers
Almost ready for finish work on this full basement/bathroom remodel. Thanks Teufel llc for electrical service.
Install 60’ of French drain ✅
Install new framing✅
Upgrade and install new 200amp service and panel✅
Install all new plumbing✅
Install new wiring and lighting✅
Install new drywall✅
Install new stairs✅
Build new custom shower✅
Floors, trim , paint, doors, grout and fixtures on the way.
Hey there is also many ways now to keep your outdoor space warm in the winter and cool in the summer. Oh yeah they do much more.
Phoenix General Contracting LLC
December 2, 2020 at 2:09 PM ·
Before and after of an all composite deck with skirting and pergola. If we didn’t have to wait for material, would have been done in 5 days start to finish.
Before and after of an all composite deck with skirting and pergola. If we didn’t have to wait for material, would have been done in 5 days start to finish.